New Arrival China Shower Head Fitting QL-BK001 Wholesale to Palestine

New Arrival China
 Shower Head Fitting QL-BK001 Wholesale to Palestine

Short Description:


Product Detail

FAQ

Product Tags

Our products are widely recognized and trusted by users and can meet continuously developing economic and social needs for New Arrival China Shower Head Fitting QL-BK001 Wholesale to Palestine, Standing still today and looking into the future, we sincerely welcome customers all over the world to cooperate with us.


  • Previous:
  • Next:
  • Q: Are you trading company or manufacturer ?

    A: We are factory.

    Q: How long is your delivery time?

    A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

    Q: Do you provide samples ? is it free or extra ?

    A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

    Q: What is your terms of payment ?

    A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
    If you have another question, pls feel free to contact us as below:




  • Triton Showers – http://www.tritonshowers.com

    A short video showing the T80Z Fast-Fit being installed and replacing the Mira Vie.

    If you’ve ever struggled to replace an electric shower due to pipe and cable positions, then the T80Z Fast Fit is the shower for you.

    It has 8 water entry points; top, back, bottom and side entry on the left, and the same on the right.

    And 6 electric entry points; top, back and bottom on the left and the same again on the right. This makes it a hassle free, fast fit every time.

    It’s ideal for new installations and perfect for replacing most existing showers.

    Providing the existing electric supply complies with the relevant safety regulations, and the water supply is adequate, you can fit a T80Z Fast Fit with the same kilowatt rating as the old shower, in no time at all.

    Let’s see just how quick and easy it is to replace a typical (Mira Vie) installation with the T80Z Fast Fit…

    First make sure the electric and water supplies are isolated.

    Now unscrew and remove the cover.
    Test to check that the electric supply is isolated before detaching the service tunnel.

    Here the water and the electric supplies enter from the rear on the left.

    Disconnect the supply cable.

    Then disconnect the water supply.

    Remove the wall fixing screws and remove the shower from the wall.

    Now for the T80Z Fast Fit.

    Take off the bottom trim plate and fit the top pipe entry trims.

    Water connection is required on the left, so the Swivel Water Inlet does not need to be adjusted.

    Electric connection is on the left; the Swing Fit Terminal is supplied assembled in this position; so no adjustment is required.

    Position the T80z fast fit over the existing screw holes then measure and cut the length of pipe needed to extend down to the shower inlet.

    Connect the pipe to the coupler.

    Fit a compression elbow onto the swivel inlet and connect onto the water pipe.

    Check the back plate is level and mark the new wall fixing points.

    Next remove the unit and drill and plug the new holes.

    Place the unit back on the wall and connect it to the water supply.

    Then screw the back plate to the wall.

    Fully tighten the water connection, and turn on the water to check for leaks.

    Connect the supply cable to the terminal blocks making sure that the connections are fully tightened.

    Now fit the bottom trim plate.

    Clip the power indicator light into the front cover.
    And make sure that the controls are correctly aligned.

    Fit the cover and secure it with the 3 fixing screws.

    Finally, connect the hose to the unit, turn on the electric supply and commission the shower on a cold setting….

    ….now there’s just the shower kit to replace.
    If you haven’t already done so, remove the old kit from the wall.

    In some cases you can use the existing fixing holes
    for the new shower kit.

    Start by fitting the top fixing plate to the preferred height, using the existing hole if possible, then slide the bracket onto it.

    Now fit the showerhead holder, the soap dish and the hose retainer on to the rail.

    Fit the bottom bracket and fixing plate onto the rail, and align with the holes in the rail. Secure with the long screw.

    Next, guide the rail into the top bracket. The rail can be adjusted; in this case to line up with the original fixing hole. There may be times when a new fixing point is needed.

    Now screw the bracket to the wall.

    Fit the top…and the bottom trims, feed the shower hose through the hose retainer, fit the showerhead to the hose and finally place it in the showerhead holder.

    Triton Showers – http://www.tritonshowers.com



    Me and a buddy in UWEC drainage pipe, exploring. Its down Putnam trail.

    Hahaha taken after Bear Grylls.

    Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Tree

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Car

    WhatsApp Online Chat !