Newly Arrival Drain DT-2030 in Oman

Newly Arrival 
 Drain DT-2030 in Oman

Short Description:


Product Detail

FAQ

Product Tags

We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with the good quality at the reasonable price for Newly Arrival Drain DT-2030 in Oman, Our company will continue to adhere to the " superior quality, reputable, the user first " principle wholeheartedly. We warmly welcome friends from all walks of life to visit and give guidance, work together and create a brilliant future!


  • Previous:
  • Next:
  • Q: Are you trading company or manufacturer ?

    A: We are factory.

    Q: How long is your delivery time?

    A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

    Q: Do you provide samples ? is it free or extra ?

    A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

    Q: What is your terms of payment ?

    A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
    If you have another question, pls feel free to contact us as below:




  • http://www.plumberx.com
    In this video we start by removing the old two handle tub and shower valve from inside the wall. First we remove the handles and spout leaving the shower head in place to hold up the old shower valve and keeping it there until the new shower valve is in place this makes it easy and keeps use inline with the new installation and makes it very easy to line up the new shower head. Now that we have the handle off its time to go around on the back side and cut into the wall or if were lucky there just may be a trap door on the back side that gives us access to the tub and shower valve from the back side. Once on the back side of the tub and shower valve we start by disconnecting the unions on the old two handle tub and shower valve. Now the part that goes up to the shower head is copper. What we are going to do here is take our torch and heat the solder connection and pull the valve loose from the shower head riser pipe. Now with the old tub and shower valve out the way lets go back to the front side in the bath room. Now this was a three handle tub and shower valve so were going to have to make some adjustments to the hole in the wall in this case we will have to open the middle hole a little wider for the new single handle tub and shower valve. This is not your standard drywall (sheetrock) wall this is old and very thick no cutting this with a saw saw. What were going to do here is use a hammer and just lightly knock out pieces of the wall slow and easy. Don’t worry about covering up the old holes they make a cover plate for that. We have the hole just how we won’t it lets go back to the other side behind the tub and shower. What I like to do is put my new tub and shower valve to gather and solder pieces in place before I start working in the wall with it and I also remove the washers in the valve so we don’t damage the washers with the hot torch and burn them up once all this is done, I take the tub and shower valve and put it into place line it up and make all the necessary connections from the back side from here I go back to the front of the valve in that bathroom and start putting all the trim on but installing the cover plate first then if you like caulk it.



    3210 E Kaweah Avenue Visalia California Homes for Sale | www.realtyconcepts.com | Nancy Watson with Realty Concepts | See full property details at http://www.realtyconcepts.com/listings/detail.php?lid=114872341&utm_source=PropertiesInMotion&utm_medium=video&utm_campaign=company | Completely Renovated and Move in Ready!! This 3 Bedroom 1 Bath home features a Brand New Kitchen with all New Stainless Steel Appliances and New kitchen Sink and Faucet. Both Kitchen and Bathroom have New Cabinets and Granite Counters. There are Custom Tile Floors throughout the Living Space, Bathroom and Large Laundry Room. All Bedrooms have New Carpet and New Ceiling Fans. All Plumbing and Lighting Fixtures throughout are new, as well as the Door Knobs and Hinges. Freshly Painted inside and out. Energy Features include Dual Paned Windows and Upgraded Insulation. The Roof and HVAC are approximately 10 years old.

    Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Cup

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Cup

    WhatsApp Online Chat !